Bathroom layout planFixtures positioned before first fix starts.
TRADE — BR
Full strip-out through to tiling and fittings, with the plumbing and electrics signed off before a single tile goes up — waterproofed right, not just sealed round the edges.
Recent work
A sample of patterns and materials from bathroom renovation jobs — swap in real project photography as jobs are completed.
Bathroom layout planFixtures positioned before first fix starts.
Fully tanked wet roomWaterproof membrane before a single tile goes up.
Natural stone, sealedSealed and finished wet-room ready.
Herringbone floor tilingPorcelain floor, laid on a properly screeded base.
Electrics & extractionZoned lighting and extraction to bathroom regs.
Fixtures & fittingsBath, basin and WC connected and tested.
These are illustrative finish samples, not photos of a specific past job — real project photos go here once we have them.
What's included
Design & layoutFixtures and drainage planned before anything's stripped out.
Strip-out & waterproofingOld suite removed, walls and floor tanked before tiling.
First-fix tradesPlumbing and electrics run and tested before tiling starts.
Tiling & fit-outTiled, fittings connected, sealed and signed off.
Get in touch
Send the details below, or call direct — most quotes start with a short site visit, free and without obligation.