1. Home
  2. Trades
  3. Bathroom Renovations

TRADE — BR

Bathroom Renovations

Full strip-out through to tiling and fittings, with the plumbing and electrics signed off before a single tile goes up — waterproofed right, not just sealed round the edges.

CoverageOrpington · 20mi radius
Typical job1 – 3 weeks
Wet areasFully tanked before tiling

Recent work

The kind of finish we're aiming for.

A sample of patterns and materials from bathroom renovation jobs — swap in real project photography as jobs are completed.

Layout plan

Bathroom layout planFixtures positioned before first fix starts.

Tanking

Fully tanked wet roomWaterproof membrane before a single tile goes up.

Natural stone

Natural stone, sealedSealed and finished wet-room ready.

Floor tiling

Herringbone floor tilingPorcelain floor, laid on a properly screeded base.

Electrics

Electrics & extractionZoned lighting and extraction to bathroom regs.

Fittings

Fixtures & fittingsBath, basin and WC connected and tested.

What's included

Every bathroom renovation job, done properly.

PLAN

Design & layoutFixtures and drainage planned before anything's stripped out.

STRIP

Strip-out & waterproofingOld suite removed, walls and floor tanked before tiling.

FIRST

First-fix tradesPlumbing and electrics run and tested before tiling starts.

FIT

Tiling & fit-outTiled, fittings connected, sealed and signed off.

Get in touch

Tell us about your bathroom.

Send the details below, or call direct — most quotes start with a short site visit, free and without obligation.

PHONE 07946 526372 WHATSAPP Message us EMAIL vision_builder@yahoo.com AREA Orpington · 20mi radius